Robotaxi phase 2 starts in Doha
MoT and Mowasalat (Karwa) began phase 2 of the electric robotaxi trial: two level-4 vehicles for 12 months on mapped routes (Old Doha Port, MIA, Souq Waqif, West Bay, Sheraton Doha to end of Diplomatic Street).
Checked 24 Nov 2026 · Sources below
MoT and Mowasalat (Karwa) began phase 2 of the electric robotaxi trial: two level-4 vehicles for 12 months on mapped routes (Old Doha Port, MIA, Souq Waqif, West Bay, Sheraton Doha to end of Diplomatic Street). Phase 1 neared 1 million km in autonomous mode vs a 500,000 km goal. A supervisor sits in the front passenger seat.
Sources
Checked 24 Nov 2026
Spotted something out of date? How we handle corrections · Tell us

